<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Wi-Skies &#8211; Electrical and Structural Engineering</title>
	<atom:link href="https://wi-skies.com/feed/" rel="self" type="application/rss+xml" />
	<link>https://wi-skies.com/</link>
	<description>Professional and Experienced Electrical and Structural Engineers</description>
	<lastBuildDate>Tue, 30 Apr 2024 21:58:04 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://wi-skies.com/wp-content/uploads/cropped-wi-skies-professional-experienced-electrical-structural-engineers-32x32.jpg</url>
	<title>Wi-Skies &#8211; Electrical and Structural Engineering</title>
	<link>https://wi-skies.com/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>10 Year Anniversary!</title>
		<link>https://wi-skies.com/uncategorized/10-year-anniversary/</link>
		
		<dc:creator><![CDATA[Wi-SkiesAdmin]]></dc:creator>
		<pubDate>Tue, 30 Apr 2024 21:58:04 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=384</guid>

					<description><![CDATA[<p>As President of Wi-Skies, I am proud to celebrate our 10th year! I would like to humbly thank all our clients for your continued support through the years. I would also like to thank all current, past, and passed staff to help make this dream a reality, as it would be impossible without you. Lastly,&#8230;</p>
<p>The post <a href="https://wi-skies.com/uncategorized/10-year-anniversary/">10 Year Anniversary!</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>As President of Wi-Skies, I am proud to celebrate our 10th year!  I would like to humbly thank all our clients for your continued support through the years.  I would also like to thank all current, past, and passed staff to help make this dream a reality, as it would be impossible without you.  Lastly, I thank my family for the many personal sacrifices they have made over the years.  It takes all of us to accomplish what we have, and I am excited about what the future holds.</p>
<p>The post <a href="https://wi-skies.com/uncategorized/10-year-anniversary/">10 Year Anniversary!</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wi-Skies Announces New Lead Traffic Signal Engineer, Michael Jorgensen</title>
		<link>https://wi-skies.com/uncategorized/wi-skies-announces-new-lead-traffic-signal-engineer-michael-jorgensen/</link>
		
		<dc:creator><![CDATA[Wi-SkiesAdmin]]></dc:creator>
		<pubDate>Mon, 07 Nov 2022 20:07:38 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=326</guid>

					<description><![CDATA[<p>Wi-Skies would like to announce our most recent addition, Michael Jorgensen. Mike joined the team with an impressive resume. He was a Traffic Engineer Specialist with the Iowa Department of Transportation (IADOT) in the Office of Traffic and Safety for 25 years. He has copious amounts of traffic design experience and will round out our&#8230;</p>
<p>The post <a href="https://wi-skies.com/uncategorized/wi-skies-announces-new-lead-traffic-signal-engineer-michael-jorgensen/">Wi-Skies Announces New Lead Traffic Signal Engineer, Michael Jorgensen</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Wi-Skies would like to announce our most recent addition, Michael Jorgensen. Mike joined the team with an impressive resume. He was a Traffic Engineer Specialist with the Iowa Department of Transportation (IADOT) in the Office of Traffic and Safety for 25 years. He has copious amounts of traffic design experience and will round out our company with his traffic signal design experience. His experience and fun personality will fit in perfectly at Wi-Skies!</p>
<p>The post <a href="https://wi-skies.com/uncategorized/wi-skies-announces-new-lead-traffic-signal-engineer-michael-jorgensen/">Wi-Skies Announces New Lead Traffic Signal Engineer, Michael Jorgensen</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wi-Skies Announces New Lead Field Engineer, John Falcone</title>
		<link>https://wi-skies.com/uncategorized/wi-skies-announces-new-lead-field-engineer-welcomes-illinois-tolling-its-manager-john-falcone-to-the-team/</link>
		
		<dc:creator><![CDATA[Wi-SkiesAdmin]]></dc:creator>
		<pubDate>Tue, 15 Feb 2022 22:22:29 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=273</guid>

					<description><![CDATA[<p>Prior to joining Wi-Skies, John gained extensive experience in project management, installation, testing, commissioning and maintenance for tolling and ITS. John directed the activities of subcontractors and vendors to ensure the proper installation of Open Road Tolling, manual and I-Pass only lanes, and coin machines for the Illinois State Toll Highway Authority (ISTHA). He has&#8230;</p>
<p>The post <a href="https://wi-skies.com/uncategorized/wi-skies-announces-new-lead-field-engineer-welcomes-illinois-tolling-its-manager-john-falcone-to-the-team/">Wi-Skies Announces New Lead Field Engineer, John Falcone</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Prior to joining Wi-Skies, John gained extensive experience in project management, installation, testing, commissioning and maintenance for tolling and ITS. John directed the activities of subcontractors and vendors to ensure the proper installation of Open Road Tolling, manual and I-Pass only lanes, and coin machines for the Illinois State Toll Highway Authority (ISTHA). He has comprehensive experience in staff management, workforce planning and employee performance management, as well as budget management, analysis, and forecasting. John is highly skilled in team leadership, project management, evaluation of technical and project requirements, process improvement, cost reduction and vendor management. John has expert knowledge and experience in the installation and maintenance of toll collection systems as well as extensive experience in construction and installation of Intelligent Transportation Systems (ITS).</p>







<p>John holds the following certifications, as they are mandatory for the work that he has overseen for the Illinois State Toll Highway Authority (ISTHA):</p>
<ul>
<li>First Aid &amp; CPR &amp; AED</li>
<li>Excavation, Digging &amp; Locates: AST 2020 Field Station</li>
<li>Fall Protection &amp; Bucket Trucks: AST 2020 Field Station</li>
<li>Cranes – Rigging, Signals &amp; Load Charts: AST 2020 Field Station</li>
<li>Backing, Spotting &amp; Load Securement: AST 2020 Field Station</li>
<li>MOT &amp; Closures: AST 2020 Field Station</li>
<li>Fall Protection Hazard Awareness</li>
<li>Traffic Control Hazard Awareness</li>
<li>Confined Space Hazard Awareness</li>
<li>Locates Best Practices (One Call Compliance)</li>
<li>Trenching &amp; Excavation Hazard Awareness</li>
<li>Electrical Hazard Awareness</li>
<li>Load Securement</li>
</ul>
<p>The post <a href="https://wi-skies.com/uncategorized/wi-skies-announces-new-lead-field-engineer-welcomes-illinois-tolling-its-manager-john-falcone-to-the-team/">Wi-Skies Announces New Lead Field Engineer, John Falcone</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wi-Skies to provide lighting for SCDOT&#8217;s Carolina Crossroads “Malfunction Junction”</title>
		<link>https://wi-skies.com/projects/wiskies-to-provide-lighting-for-scdots-carolina-crossroads-malfunction-junction/</link>
		
		<dc:creator><![CDATA[Wi-SkiesAdmin]]></dc:creator>
		<pubDate>Mon, 31 Jan 2022 21:56:05 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=264</guid>

					<description><![CDATA[<p>Wi-Skies has partnered with Infrastructure Consulting &#38; Engineering and have won the first two phases for this massive design-build effort, the largest construction venture in South Carolina transportation history! This five-phase project will improve fourteen miles of I-20, I-26 and I-126 that includes the area commonly called “Malfunction Junction”. We are providing the design and&#8230;</p>
<p>The post <a href="https://wi-skies.com/projects/wiskies-to-provide-lighting-for-scdots-carolina-crossroads-malfunction-junction/">Wi-Skies to provide lighting for SCDOT&#8217;s Carolina Crossroads “Malfunction Junction”</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Wi-Skies has partnered with Infrastructure Consulting &amp; Engineering and have won the first two phases for this massive design-build effort, the largest construction venture in South Carolina transportation history!</p>



<p>This five-phase project will improve fourteen miles of I-20, I-26 and I-126 that includes the area commonly called “Malfunction Junction”.</p>



<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="648" height="187" src="https://wi-skies.com/wp-content/uploads/scdot-carolina-crossroads.jpg" alt="" class="wp-image-265" srcset="https://wi-skies.com/wp-content/uploads/scdot-carolina-crossroads.jpg 648w, https://wi-skies.com/wp-content/uploads/scdot-carolina-crossroads-300x87.jpg 300w" sizes="(max-width: 648px) 100vw, 648px" /><figcaption>Wi-Skies Engineering has been selected for lighting the largest construction venture in South Carolina transportation history!</figcaption></figure>



<p>We are providing the design and the lighting for these two phases, which includes both high mast towers along the interstates and interchanges as well as conventional roadway lighting along the ramps and side streets. Phase 2 includes a very complex Diverging Diamond Interchange at the crossing of US176 and I-20. Information here for the Carolina Crossroads overall project: <a aria-label="undefined (opens in a new tab)" href="https://www.SCDOTCarolinaCrossroads.com" target="_blank" rel="noreferrer noopener">https://www.SCDOTCarolinaCrossroads.com</a></p>
<p>The post <a href="https://wi-skies.com/projects/wiskies-to-provide-lighting-for-scdots-carolina-crossroads-malfunction-junction/">Wi-Skies to provide lighting for SCDOT&#8217;s Carolina Crossroads “Malfunction Junction”</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>IA DOT on-call lighting</title>
		<link>https://wi-skies.com/uncategorized/ia-dot-on-call-lighting/</link>
		
		<dc:creator><![CDATA[Sean Beckham]]></dc:creator>
		<pubDate>Thu, 17 Jun 2021 20:06:07 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=252</guid>

					<description><![CDATA[<p>Wi-Skies serves as the roadway lighting subject matter experts for Iowa Department of Transportation (IADOT). We are reviewing and revising their lighting policy, standards, specifications and pay items to bring them more current. We provide design reviews from other firm designs and development of lighting master plans and retrofit projects. We have provided several large-scale&#8230;</p>
<p>The post <a href="https://wi-skies.com/uncategorized/ia-dot-on-call-lighting/">IA DOT on-call lighting</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong><em>Wi-Skies serves as the roadway lighting subject matter experts for Iowa Department of Transportation (IADOT).</em></strong></p>



<p>We are reviewing and revising their lighting policy, standards, specifications and pay items to bring them more current. We provide design reviews from other firm designs and development of lighting master plans and retrofit projects. We have provided several large-scale LED retrofit designs, developed the LED specification and evaluated many short tunnels for experimental installation stemming from our work with short tunnel research.</p>



<figure class="wp-block-image size-large"><img decoding="async" width="648" height="187" src="https://wi-skies.com/wp-content/uploads/IowaDOT.jpg" alt="Iowa Department of Transportation" class="wp-image-190" srcset="https://wi-skies.com/wp-content/uploads/IowaDOT.jpg 648w, https://wi-skies.com/wp-content/uploads/IowaDOT-300x87.jpg 300w" sizes="(max-width: 648px) 100vw, 648px" /></figure>



<p>We share our experiences with other state agencies and municipalities to assist the Iowa DOT lighting program move to the front of the line on many relevant issues, such as high mast tower lighting deployment, among other issues.</p>
<p>The post <a href="https://wi-skies.com/uncategorized/ia-dot-on-call-lighting/">IA DOT on-call lighting</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tennessee DOT on-call lighting</title>
		<link>https://wi-skies.com/projects/tennessee-dot-on-call-lighting/</link>
		
		<dc:creator><![CDATA[Wi-SkiesAdmin]]></dc:creator>
		<pubDate>Thu, 03 Jun 2021 08:15:00 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Tennessee DOT Lighting]]></category>
		<category><![CDATA[Tennessee Roadway Lightin]]></category>
		<category><![CDATA[TN DOT]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=248</guid>

					<description><![CDATA[<p>Wi-Skies holds a key role with Tennessee Department Of Transportation, where we are in the process of overhauling the Department’s lighting policy manual, specifications and standard drawings! Much of this work is essential due to evolving technologies and national recommended practice, but also due to debatable language and directive within the existing policies that put&#8230;</p>
<p>The post <a href="https://wi-skies.com/projects/tennessee-dot-on-call-lighting/">Tennessee DOT on-call lighting</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<figure class="wp-block-image size-large"><img decoding="async" width="410" height="123" src="https://wi-skies.com/wp-content/uploads/TennesseeDOT.jpg" alt="" class="wp-image-249" srcset="https://wi-skies.com/wp-content/uploads/TennesseeDOT.jpg 410w, https://wi-skies.com/wp-content/uploads/TennesseeDOT-300x90.jpg 300w" sizes="(max-width: 410px) 100vw, 410px" /></figure>



<p>Wi-Skies holds a key role with Tennessee Department Of Transportation, where we are in the process of overhauling the Department’s lighting policy manual, specifications and standard drawings! Much of this work is essential due to evolving technologies and national recommended practice, but also due to debatable language and directive within the existing policies that put the Department at risk for design-build efforts.</p>



<p>Wi-Skies experience on the other side of the table provides invaluable insight to improved contract language, which would be difficult to debate in the future. This work also includes adding several standard drawings in an effort to streamline the design and construction work throughout the state.</p>
<p>The post <a href="https://wi-skies.com/projects/tennessee-dot-on-call-lighting/">Tennessee DOT on-call lighting</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Langford Parkway Lighting Replacement</title>
		<link>https://wi-skies.com/projects/langford-parkway-lighting-replacement/</link>
		
		<dc:creator><![CDATA[Wi-SkiesAdmin]]></dc:creator>
		<pubDate>Mon, 22 Jun 2020 21:03:12 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=216</guid>

					<description><![CDATA[<p>Langford Parkway is a major thoroughfare which connects I-285 to I-85 north of the Atlanta airport in the southwest side of the city.&#160; The corridor was originally built as an urban collector, but over time has become an access control freeway with entrance and exit ramps.&#160; However, urban curb still exists in portions of the&#8230;</p>
<p>The post <a href="https://wi-skies.com/projects/langford-parkway-lighting-replacement/">Langford Parkway Lighting Replacement</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Langford Parkway is a major thoroughfare which connects I-285 to I-85 north of the Atlanta airport in the southwest side of the city.&nbsp; The corridor was originally built as an urban collector, but over time has become an access control freeway with entrance and exit ramps.&nbsp;</p>



<p>However, urban curb still exists in portions of the roadway and the lighting was installed based on the original urban collector setting and subsequent setbacks.&nbsp; Because of this, most of the lighting installed on the outside of the roadway is within unprotected clear zone and subject to frequent knock-downs.&nbsp; As the entire 6.5 mile corridor is continuously lit, this results in a lot of maintenance.&nbsp; To properly address this situation, coupled with inadequate lighting, the recommendation was made to provide a new lighting system through the corridor which will increase pole setbacks coupled with barrier protection as warranted.&nbsp; This new lighting system will also replace and upgrade the existing lighting along the median wall, where applicable.&nbsp;</p>



<p>As the corridor was untouched for decades, full survey, LIDAR and SUE is necessary, which we are coordinating the effort on through our sub-consultant.&nbsp; The entire electrical system, including service point locations, cabling and conduit except for that within the barrier walls for the lighting system will be replaced as part of this project as well.&nbsp;</p>



<p>View <a href="https://www.youtube.com/watch?v=5hMzVm_WNVY" target="_blank" rel="noreferrer noopener">video of Langford Parkway by FreewayJim</a></p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="668" height="370" src="https://wi-skies.com/wp-content/uploads/LankfordAve-Atlanta.jpg" alt="" class="wp-image-217" srcset="https://wi-skies.com/wp-content/uploads/LankfordAve-Atlanta.jpg 668w, https://wi-skies.com/wp-content/uploads/LankfordAve-Atlanta-300x166.jpg 300w" sizes="auto, (max-width: 668px) 100vw, 668px" /></figure>
<p>The post <a href="https://wi-skies.com/projects/langford-parkway-lighting-replacement/">Langford Parkway Lighting Replacement</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wi-Skies Designs Lighting of Pedestrian Bridge, Mercedes-Benz Stadium in Atlanta, GA</title>
		<link>https://wi-skies.com/projects/wi-skies-designs-lighting-of-pedestrian-bridge-mercedes-benz-stadium-in-atlanta-ga/</link>
		
		<dc:creator><![CDATA[Sean Beckham]]></dc:creator>
		<pubDate>Wed, 10 Jun 2020 21:40:29 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Mercedes-Benz Stadium in Atlanta]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=213</guid>

					<description><![CDATA[<p>Wi-Skies designs Pedestrian Bridge at Mercedes-Benz Stadium in Atlanta, GA</p>
<p>The post <a href="https://wi-skies.com/projects/wi-skies-designs-lighting-of-pedestrian-bridge-mercedes-benz-stadium-in-atlanta-ga/">Wi-Skies Designs Lighting of Pedestrian Bridge, Mercedes-Benz Stadium in Atlanta, GA</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>As part of a design-build project, Wi-Skies designed the lighting for a pedestrian bridge to safely allow pedestrians to cross the busy six-lane roadway immediately adjacent to the new Atlanta Falcons stadium (Northside Dr).</p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="520" src="https://wi-skies.com/wp-content/uploads/wi-skies-structural-lighting-engineers-georgia-1024x520.jpg" alt="wi-skies-structural-lighting-engineers-georgia" class="wp-image-112" srcset="https://wi-skies.com/wp-content/uploads/wi-skies-structural-lighting-engineers-georgia-1024x520.jpg 1024w, https://wi-skies.com/wp-content/uploads/wi-skies-structural-lighting-engineers-georgia-300x152.jpg 300w, https://wi-skies.com/wp-content/uploads/wi-skies-structural-lighting-engineers-georgia-768x390.jpg 768w, https://wi-skies.com/wp-content/uploads/wi-skies-structural-lighting-engineers-georgia.jpg 1280w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>



<p>The bridge spans a total of almost 1000’ of walkable path, including a 140’ long covered portion as it crosses Northside Drive. All of the pathway is being lit to high pedestrian traffic lighting design criteria, including vertical illuminance design criteria, which is being accomplished with a combination of pedestrian scale LED fixtures for outside of the covered portion and architectural ceiling mounted fixtures inside the covered portion.</p>



<p>The sidewalk areas along the perimeter of the west loop are also being lit to ensure good visibility of fellow pedestrians while not providing a glare concern to the drivers along Northside Dr.</p>



<p>In addition to the pedestrian lighting, Wi-Skies was also responsible for designing the impressive architectural lighting features on, in and around the bridge. Both sides of the bridge have continuous multi-color rope lights which span a total of over 2000’. Additionally, accent lights are provided at crucial areas, such as the bridge decorative columns and outer aluminum skin of the bridge as it crosses Northside Dr. All of the decorative features are centrally controlled for the client to have the ability to change the colors freely, depending on the venue.</p>



<p>While the architectural features of this bridge will mesh well with the new stadium’s architectural features, as it is immediately adjacent to the new stadium which will be aerially viewed often to show off both the stadium’s architectural features, the lighting on the bridge really sets the bridge and its features apart from the stadium.</p>
<p>The post <a href="https://wi-skies.com/projects/wi-skies-designs-lighting-of-pedestrian-bridge-mercedes-benz-stadium-in-atlanta-ga/">Wi-Skies Designs Lighting of Pedestrian Bridge, Mercedes-Benz Stadium in Atlanta, GA</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New Lighting Design of Two Interchanges and WIM System for Interstate 26 South Carolina</title>
		<link>https://wi-skies.com/projects/new-lighting-design-of-two-interchanges-and-wim-system-for-interstate-26-south-carolina/</link>
		
		<dc:creator><![CDATA[Wi-SkiesAdmin]]></dc:creator>
		<pubDate>Thu, 04 Jun 2020 16:36:50 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=207</guid>

					<description><![CDATA[<p>Lighting Design of Two Interchanges and WIM System for Interstate 26 South Carolina</p>
<p>The post <a href="https://wi-skies.com/projects/new-lighting-design-of-two-interchanges-and-wim-system-for-interstate-26-south-carolina/">New Lighting Design of Two Interchanges and WIM System for Interstate 26 South Carolina</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading"><strong>I-26 Widening Between MM 85-101 in South Carolina</strong></h2>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="956" height="804" src="https://wi-skies.com/wp-content/uploads/I-26-South-Carolina-2InterchangesWIM.jpg" alt="" class="wp-image-208" srcset="https://wi-skies.com/wp-content/uploads/I-26-South-Carolina-2InterchangesWIM.jpg 956w, https://wi-skies.com/wp-content/uploads/I-26-South-Carolina-2InterchangesWIM-300x252.jpg 300w, https://wi-skies.com/wp-content/uploads/I-26-South-Carolina-2InterchangesWIM-768x646.jpg 768w" sizes="auto, (max-width: 956px) 100vw, 956px" /></figure>



<p>Sixteen miles of I-26 is being expanded to accommodate an additional lane in each direction from mile post 85 to 101 north of Columbia, <a href="https://www.scdot.org/" target="_blank" rel="noreferrer noopener">South Carolina</a>. As part of the project, two interchanges are being revised which include full lighting design which Wi-Skies is responsible for designing. Additionally, Wi-Skies will design and implement a new state of the art Weigh-In-Motion (WIM) system in the northbound direction.</p>
<p>The post <a href="https://wi-skies.com/projects/new-lighting-design-of-two-interchanges-and-wim-system-for-interstate-26-south-carolina/">New Lighting Design of Two Interchanges and WIM System for Interstate 26 South Carolina</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>I-285 at SR 400 Interchange Lighting and ITS Power (Atlanta, GA)</title>
		<link>https://wi-skies.com/uncategorized/i-285-at-sr-400-interchange-lighting-and-its-power-atlanta-ga/</link>
		
		<dc:creator><![CDATA[Sean Beckham]]></dc:creator>
		<pubDate>Thu, 28 May 2020 22:29:45 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://wi-skies.com/?p=195</guid>

					<description><![CDATA[<p>As part of the largest design-build effort the state has ever taken on, Wi-Skies designed the entire lighting and electrical ITS work for the interchange, which comprised of several hundred devices. This interchange is the busiest and fastest-growing interchange in the Atlanta area, subject to traffic volumes of over 250,000 vehicles daily. The overall design&#8230;</p>
<p>The post <a href="https://wi-skies.com/uncategorized/i-285-at-sr-400-interchange-lighting-and-its-power-atlanta-ga/">I-285 at SR 400 Interchange Lighting and ITS Power (Atlanta, GA)</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>As part of the <strong>largest design-build effort the state has ever taken on</strong>, Wi-Skies designed the entire lighting and electrical ITS work for the interchange, which comprised of several hundred devices.</p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="360" height="148" src="https://wi-skies.com/wp-content/uploads/I-285-SR400.jpg" alt="" class="wp-image-196" srcset="https://wi-skies.com/wp-content/uploads/I-285-SR400.jpg 360w, https://wi-skies.com/wp-content/uploads/I-285-SR400-300x123.jpg 300w" sizes="auto, (max-width: 360px) 100vw, 360px" /></figure>



<p>This interchange is the busiest and fastest-growing interchange in the Atlanta area, subject to traffic volumes of over 250,000 vehicles daily. The overall design intent is to provide collector-distributor (CD) lanes throughout the project limits for a total of 8.3 miles along both SR 400 and I-285, which will eliminate much of the congestion in the area due to a poor existing interchange layout.</p>



<p>Throughout the design process, several lighting and ITS design alternatives were designed and considered.</p>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="956" height="804" src="https://wi-skies.com/wp-content/uploads/I285-SR400-MAP.ppt.jpg" alt="" class="wp-image-204" srcset="https://wi-skies.com/wp-content/uploads/I285-SR400-MAP.ppt.jpg 956w, https://wi-skies.com/wp-content/uploads/I285-SR400-MAP.ppt-300x252.jpg 300w, https://wi-skies.com/wp-content/uploads/I285-SR400-MAP.ppt-768x646.jpg 768w" sizes="auto, (max-width: 956px) 100vw, 956px" /></figure>
<p>The post <a href="https://wi-skies.com/uncategorized/i-285-at-sr-400-interchange-lighting-and-its-power-atlanta-ga/">I-285 at SR 400 Interchange Lighting and ITS Power (Atlanta, GA)</a> appeared first on <a href="https://wi-skies.com">Wi-Skies - Electrical and Structural Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
