Wi-Skies to provide lighting for SCDOT’s Carolina Crossroads “Malfunction Junction”
Wi-Skies has partnered with Infrastructure Consulting & Engineering and have won the first two phases for this massive design-build effort, the largest construction venture in South Carolina transportation history!
This five-phase project will improve fourteen miles of I-20, I-26 and I-126 that includes the area commonly called “Malfunction Junction”.
We are providing the design and the lighting for these two phases, which includes both high mast towers along the interstates and interchanges as well as conventional roadway lighting along the ramps and side streets. Phase 2 includes a very complex Diverging Diamond Interchange at the crossing of US176 and I-20. Information here for the Carolina Crossroads overall project: https://www.SCDOTCarolinaCrossroads.com